饶阳县第二污水处理厂日处理能力15000吨/天。污泥主要是处理生活污水产生,污泥规模5 6吨/天(含水率80%),经特高压污泥压榨机压榨,污泥含水率40%左右。
The second sewage treatment plant in Raoyang County has a daily processing capacity of 15000 tons. Sludge is mainly generated from the treatment of domestic sewage, with a sludge scale of 56 tons/day (moisture content of 80%). After being pressed by an ultra-high pressure sludge press, the sludge has a moisture content of about 40%.